Here are 5 key software testing steps that every engineer should perform:

  1. Test Planning: The first step in software testing is to create a test plan. This plan should include the testing strategy, the scope of the testing, the test environment, and the resources required for testing.

  2. Test Design: Once the test plan is in place, the next step is to design the test cases. This involves identifying the various scenarios that need to be tested, creating test cases to cover those scenarios, and defining the expected results for each test case.

  3. Test Execution: Once the test cases are designed, the next step is to execute them. During this phase, the software is tested against the test cases, and the results are recorded.

  4. Defect Tracking: During the test execution phase, any defects or issues that are identified should be recorded and tracked. This involves assigning a severity level to each defect, determining the cause of the defect, and identifying potential solutions.

  5. Test Reporting: The final step in software testing is to report the results of the testing. This includes creating a test report that summarizes the testing activities, the test results, and any defects that were identified. Join Us For : Software Testing Course in Chennai

In summary, the 5 key software testing steps that every engineer should perform are test planning, test design, test execution, defect tracking, and test reporting. By following these steps, software engineers can ensure that the software is thoroughly tested and any defects are identified and addressed before the software is released to the market.